Update 10 authored Aug 08, 2022 by Brian Jeffs's avatar Brian Jeffs
Hide whitespace changes
Inline Side-by-side
10.md
View page @ 4a3d038a
...@@ -38,12 +38,5 @@ A list of members of this advisory team and their qualifications is found [here. ...@@ -38,12 +38,5 @@ A list of members of this advisory team and their qualifications is found [here.
Additionally, working closely with GBO software engineers, we will develop a fully integrated Monitor and Control interface system which will be compatible with all GBO requirements for a user instrument. This is described in [Sections 7.3](/7-interfaces/7.3) and [7.4](/7-interfaces/7.4). Also, the engineering and commissioning tests shown in the [project schedule](/9-project-management/9.2) as WBS task number 5.8 will be used to validate and demonstrate on-sky performance and procedures as part of the process for qualifying as a GBO user instrument. These tests take place in the final two quarters of the project. Additionally, working closely with GBO software engineers, we will develop a fully integrated Monitor and Control interface system which will be compatible with all GBO requirements for a user instrument. This is described in [Sections 7.3](/7-interfaces/7.3) and [7.4](/7-interfaces/7.4). Also, the engineering and commissioning tests shown in the [project schedule](/9-project-management/9.2) as WBS task number 5.8 will be used to validate and demonstrate on-sky performance and procedures as part of the process for qualifying as a GBO user instrument. These tests take place in the final two quarters of the project.
1. The [project schedule](/9-project-management/9.2) includes a 9-month extension as mitigation for delays incurred by the COVID-19 pandemic and collapse of the Arecibo Telescope. We believe this will be adequate if the joint collaborative working agreement with GBO can be finalized shortly following completing this design review.
[Section 9.3](/9-project-management/9.3) addresses causes and mitigation for a budget shortfall due to COVID-19 delays, collapse of the Arecibo Telescope, and costs of moving ALPACA to the GBT. We are pursuing a supplementary funding request for $1,485,645, which will fully fund project completion through installation, integration, and commissioning as a GBO user instrument. Without this or other supplemental sources, the instrument itself can be completed, but installation, integration, and commissioning as a GBO user instrument would be unfunded.
[//]: <> (Delete this file: uploads/d4f525666db05e2f57e6aa2bae5da736/ALPACA_Advisory_Board.pdf)
[Section 11 >>](./11) [Section 11 >>](./11)
\ No newline at end of file
Clone repository