Skip to content
GitLab
Projects Groups Topics Snippets
  • /
  • Help
    • Help
    • Support
    • Community forum
    • Submit feedback
  • Sign in
  • A ALPACA-Advanced L-band Phased Array Camera for Astronomy
  • Project information
    • Project information
    • Activity
    • Members
  • Wiki
    • Wiki
  • Activity
Collapse sidebar
  • ALPACA
  • ALPACA-Advanced L-band Phased Array Camera for Astronomy
  • Wiki
  • 10

10 · Changes

Page history
Update 10 authored Aug 08, 2022 by Brian Jeffs's avatar Brian Jeffs
Hide whitespace changes
Inline Side-by-side
10.md
View page @ 9c909c08
...@@ -37,6 +37,3 @@ The direct sampling 14-bit ADCs and tight double-stage custom bandpass filtering ...@@ -37,6 +37,3 @@ The direct sampling 14-bit ADCs and tight double-stage custom bandpass filtering
A list of members of this advisory team and their qualifications is found [here.](uploads/4ab585a92b8b4fc9ef9da54a0bc13390/ALPACA_Advisor_team.pdf) A list of members of this advisory team and their qualifications is found [here.](uploads/4ab585a92b8b4fc9ef9da54a0bc13390/ALPACA_Advisor_team.pdf)
Additionally, working closely with GBO software engineers, we will develop a fully integrated Monitor and Control interface system which will be compatible with all GBO requirements for a user instrument. This is described in [Sections 7.3](/7-interfaces/7.3) and [7.4](/7-interfaces/7.4). Also, the engineering and commissioning tests shown in the [project schedule](/9-project-management/9.2) as WBS task number 5.8 will be used to validate and demonstrate on-sky performance and procedures as part of the process for qualifying as a GBO user instrument. These tests take place in the final two quarters of the project. Additionally, working closely with GBO software engineers, we will develop a fully integrated Monitor and Control interface system which will be compatible with all GBO requirements for a user instrument. This is described in [Sections 7.3](/7-interfaces/7.3) and [7.4](/7-interfaces/7.4). Also, the engineering and commissioning tests shown in the [project schedule](/9-project-management/9.2) as WBS task number 5.8 will be used to validate and demonstrate on-sky performance and procedures as part of the process for qualifying as a GBO user instrument. These tests take place in the final two quarters of the project.
[Section 11 >>](./11)
\ No newline at end of file
Clone repository
  • 1 intro alpaca
    • 1.1
    • 1.2
    • 1.3
  • 10
  • 11
  • 2.1
  • 2.2
  • 2.3.1
  • 2.3
  • 3 front end design
    • 3.1
    • 3.2
    • 3.3
    • 3.4
    • 3.5
    • 3.6
View All Pages